Sewage Purifying



The sewage farm, which works on the principle of active mud, is constructed in Kanjiža in 1994. A complete in-going building is mounted for 15.000 equivalent residents, and biodisc, the equipment of I phase, for 4000 equivalent residents (ES). After constructing the aeration pool, the subsequent deposit and stabilization pool in 1997 the second phase is put into operation with the capacity of 7000 ES.
In 1997 and 1998 some works were done in the construction of sewage farm in Horgoš when a command building is built, and also the object for gratings and sand-keeper. The sewage farm is being continued in the lagoons, which will represent the second level of purification of waste water after, the building of the second phase (active aeration).



 

 

 